Woodbury Moving Forward to Four Stormwater Mitigation Final Designs
Progress

Woodbury Moving Forward to Four Stormwater Mitigation Final Designs

The Central Vermont Regional Planning Commission (CVRPC) on behalf of the Town of Woodbury recently received two grants: Design Implementation Block Grant from the Southern Windsor County Regional Planning Commission and an Ecosystem Restoration Program grant award from the Vermont Department of Environmental Conservation (DEC). These funds will be used to bring four preliminary stormwater … Continue reading

Final Design for the Health Center in Plainfield Addresses Large Sediment Input to Winooski River
Progress

Final Design for the Health Center in Plainfield Addresses Large Sediment Input to Winooski River

The Central Vermont Stormwater Master Plan for Barre Town, Barre City, and Plainfield was completed in 2018 and identified The Health Center in Plainfield as a priority. Before The Health Center was constructed, there was evidence of a gully which has since gotten deeper, wider, and longer. It sits between the existing stormwater pond and … Continue reading